top of page

CIDADE DE ILHABELA

CIDADE DE ILHABELA (CDI) converted from VLCC, the refit mainly included the addition of a multi-point mooring system, an oil recovery platform, main deck replacement, cabin reinforcement, a new growth area and a new combustion tower base, nacelle restoration and cabin sanding and special coating.

The refit of the CDI, which took 20 months to complete, included the addition of a multi-point mooring system, an oil recovery platform, replacement of the main deck, cabin reinforcements, new growth area and combustion tower bases, cabin restoration and cabin sanding, and special coatings, all of which were difficult and highly complex. After the refit, the CDI, which utilizes the most technologically advanced multi-point mooring system available, will be self-sustaining and will not need to be docked for overhauling for 25 years.

bottom of page